Kitchen-diner.

A large kitchen and utility room, refreshed top to bottom in two days.

Finished sage green kitchen-diner
RoomsKitchen & utility
WorkWalls, ceilings & woodwork
Time2 days

Covered first, then painted.

With a full kitchen to work around, everything was sheeted and taped before any paint was opened: worktops, units, appliances and the floor.

Walls and ceilings were then painted through, woodwork finished, and the room handed back clean and ready to use.

Kitchen fully sheeted before painting
Day one: everything protected
The finished kitchen-diner
Day two: finished